C           E            a            G           IMR

Cuadro de texto:     Control of Entrance auto Generated Interactive

OPERATION (2 of 7)

Front

General information

Operation

Contact

Applications

D.R. © 2024 - CEaGI, CHILE.

Components of the control CEaGI.

 

In figure 1 it is possible to be seen that the system is made up of three stages. Stage 1 composed by the Display Screen; Stage 2 is composed by Step 1 of 3, Step 2 of 3 and Step 3 of 3. Finally the Stage 3 that is composed by the Main Application or Computer science Application that will be occupied by the user or client. These stages are of great importance, since to the being activated one to one correctly, will allow to use the Main Application.

FIGURE 1: General diagram of characteristics of the software CEaGI.

Flecha derecha: PCuadro de texto: 2 of 7

Development

Flecha derecha: P

Información de contacto / Contact information:

Correo / Mail:

· contacto@ceagi.com

 

 

Redes sociales / Social networks:

· Facebook: CEaGI

· Twitter: CEaGI (ceagi_sa)

· YouTube: CEaGIsa

UlFeMo: 20.04.24_Ed4.15